TY - JOUR U1 - Zeitschriftenartikel, wissenschaftlich - begutachtet (reviewed) A1 - van Schalkwyk, Johannes A1 - Jooste, Johannes A1 - Lucke, Dominik T1 - A framework for selecting data acquisition technology in support of railway infrastructure predictive maintenance JF - Procedia CIRP N2 - The maintenance of railway infrastructure remains a challenge. Data acquisition technologies have evolved because of Industry 4.0, expanding the capabilities of predictive maintenance. Despite the advances, the potential of these emerging technologies has not been fully realised. This paper presents a technology selection framework in support of railway infrastructure predictive maintenance, which is based on qualitative methods. It consists of three stages, including the mapping of the infrastructure characteristics with the identified technologies, the evaluation of the most appropriate technologies, and the sourcing thereof. This presents the collective decision support output of the framework. KW - railway infrastructure KW - predictive maintenance KW - data acquisition technology KW - technolog selection framework Y1 - 2021 UN - https://nbn-resolving.org/urn:nbn:de:bsz:rt2-opus4-33352 SN - 2212-8271 SS - 2212-8271 U6 - https://doi.org/10.1016/j.procir.2021.11.142 DO - https://doi.org/10.1016/j.procir.2021.11.142 VL - 104 IS - 54th CIRP CMS 2021 – Towards Digitalized Manufacturing 4.0 SP - 845 EP - 850 S1 - 6 PB - Elsevier CY - Amsterdam ER -