Refine
Document Type
- Conference proceeding (3) (remove)
Has full text
- yes (3)
Is part of the Bibliography
- yes (3)
Institute
- Technik (3)
Publisher
The coupling of the heat and power sector is required as supply and demand in the German electricity mix drift further and further apart with a high percentage of renewable energy. Heat pumps in combination with thermal energy storage systems can be a useful way to couple the heat and power sectors. This paper presents a hardware-in the-loop test bench for experimental investigation of optimized control strategies for heat pumps. 24-hour experiments are carried out to test whether the heat pump is able to serve optimized schedules generated by a MATLAB algorithm. The results show that the heat pump is capable of following the generated schedules, and the maximum deviation of the operational time between schedule and experiment is only 3%. Additionally, the system can serve the demand for space heating and DHW at any time.
Bis zum Jahr 2050 soll in Baden Württemberg mit dem Ziel „50-80-90“ der Energiebedarf um 50% reduziert werden, die erneuerbaren Energien sollen zu 80% an der Energieversorgung beteiligt sein und die Emissionen von Treibhausgasen um 90% sinken.Entsprechende Ziele sind für andere Regionen und Länder in ähnlicher Weise festgelegt.
Damit diese Ziele erreicht werden, muss bei der Gebäudewärmeversorgung ein konsequenter Umbau stattfinden. Hier spielt die Sektorenkopplung mit Hilfe von Wärmepumpen (WP) eine entscheidende Rolle. Zur Abschätzung des Potenzials sowie des Aufwandes für einen großflächigen Einsatz von Wärmepumpen ist es unmöglich, eine spezifische und angepasste Dimensionierung der Wärmepumpensysteme für jedes einzelne Gebäude durchzuführen. Stattdessen müssen auf Seiten der Bebauung Referenzgebäude definiert und auf Seiten der Wärmepumpensysteme mittlere Leistungsdaten der am Markt befindlichen Modelle verwendet werden. Während die Festlegung von Referenzgebäuden verschiedentlich in der Literatur zu finden ist, widmet sich der erste Teil der Veröffentlichung der Vorstellung von Korrelationsfunktionen für die thermische und elektrische Leistung sowie die Leistungszahl (COP) von Wärmepumpen, die auf Basis von Herstellerdaten in Abhängigkeit der Quellen- und Vorlauftemperatur ermittelt wurden.
Konkret wurden als Ausgangsbasis für die Korrelationsfunktionen Datenblätter verschiedener Sole- und Luft-Wasser Wärmepumpen (SWP, LWP) zusammengestellt und ausgewertet. Die Grundlage hierfür war die Liste „Wärmepumpen mit Prüfnachweis eines unabhängigen Prüfinstituts“ des Bundesamts für Wirtschaft und Ausfuhrkontrolle (BAFA).
The main challenge when driving heat pumps by PV-electricity is balancing differing electrical and thermal demands. In this article, a heuristic method for optimal operation of a heat pump driven by a maximum share of PV-electricity is presented. For this purpose, the (DHW) are activated in order shift the operation of the heat pump to times of PV-generation. The system under consideration refers to thermal and electrical demands of a single family house. It consists of a heat pump, a thermal energy storage for DHW and of grid connected heating and generation of domestic hot water, the heat pump runs with two different supply temperatures and thereby achieving a maximum overall COP. Within the algorithm for optimization a set of heuristic rules is developed in a way that the operational characteristics of the heat pump in terms of minimum running and stopping times are met as well as the limiting constraints of upper and lower limits of room temperature and energy content of electricity generated, a varying number of heat pump schedules fulfilling the bundary conditions are created. Finally, the schedule offering the maximum on-site utilization of PV-electricity with a minimum number of starts of the heat pump, which serves as secondary condition, is selected. Yearly simulations of this combination have been carried out. Initial results of this method indicate a significant rise in on-site consumption of the PV-electricity and heating demand fulfilment by renewable electricity with no need for a massive TES for the heating system in terms of a big water tank.