Refine
Document Type
- Journal article (1)
- Conference proceeding (1)
Language
- English (2)
Is part of the Bibliography
- yes (2)
Institute
- Technik (2)
Publisher
- Elsevier (1)
- Newcastle University (1)
Coupling electricity and heat sector is one of the most necessary actions for the successful energy transition. Efficient electrification for space heating and domestic hot water generation is needed for buildings, which are not connected to any district heating network, as distributed heating demand momentarily is largely met by fossil fuels. Hence, hybrid energy systems will play a pivotal role for the energy transition in buildings. Heat pumps running on PV-electricity is one of the most widely discussed combination for this purpose. In this paper, a heuristic optimization method for the optimal operation of a heat pump driven by the objective for maximum onsite PV electricity utilization is presented. In this context, the thermal flexibility of the building and a thermal energy storage (TES) for generation of domestic hot water (DHW) are activated in order to shift the operation of the heat pump to times of PV-generation. Yearly simulations for a system consisting of heat pump, PV modules, building with floor heating installation and TES for DHW generation are carried out. Variation parameters for the simulation include room temperature amplitude (0.5, 1, 1.5 and 2 K) based on mean room temperature (21 °C), PV-capacity (4, 6, 8 and 10 kW) and type of heat pump (ground source and air source type). The yearly energy balances show that buildings offer significant thermal storage capacity avoiding an additional, large TES for space heating fulfillment and improving the share of onsite PV electricity utilization. With introduction of a battery, which has been analyzed as well for different sizes (1.9, 4.8, 7.7 and 10.6 kWh), the share of onsite PVelectricity utilization can even be improved. However, thermal flexibility supplemented by the varying room temperature amplitude for a bigger battery does not improve the share of onsite PV-electricity utilization. Nevertheless, even with a battery not more than 50% of the electrical load including operation of the heat pump can be covered by PV-electricity for the specific system under investigation. This is noteworthy on the one hand, since it indicates that a hybrid heating system consisting of heat pump and PV cannot solely cover the heat demand of residential buildings. One the other hand, this emphasizes the necessity to include further renewable sources like wind power, in order to draw the complete picture. This, however, is beyond the scope of this paper, which mainly focuses on introduction and verification of the novel control method with regard to a practical building.
The main challenge when driving heat pumps by PV-electricity is balancing differing electrical and thermal demands. In this article, a heuristic method for optimal operation of a heat pump driven by a maximum share of PV-electricity is presented. For this purpose, the (DHW) are activated in order shift the operation of the heat pump to times of PV-generation. The system under consideration refers to thermal and electrical demands of a single family house. It consists of a heat pump, a thermal energy storage for DHW and of grid connected heating and generation of domestic hot water, the heat pump runs with two different supply temperatures and thereby achieving a maximum overall COP. Within the algorithm for optimization a set of heuristic rules is developed in a way that the operational characteristics of the heat pump in terms of minimum running and stopping times are met as well as the limiting constraints of upper and lower limits of room temperature and energy content of electricity generated, a varying number of heat pump schedules fulfilling the bundary conditions are created. Finally, the schedule offering the maximum on-site utilization of PV-electricity with a minimum number of starts of the heat pump, which serves as secondary condition, is selected. Yearly simulations of this combination have been carried out. Initial results of this method indicate a significant rise in on-site consumption of the PV-electricity and heating demand fulfilment by renewable electricity with no need for a massive TES for the heating system in terms of a big water tank.