Planning of available resources considering ergonomics under deterministic highly variable demand
(2020)
In this paper, a method for hybrid short- to long-term planning of available resources for operations is presented, which is based on a known or deterministically forecasted but highly variable demand. The method considers quantitative measures such as the performance and the availability of resources, ergonomically relevant KPI and ultimately process costs in order to serve as a pragmatic planning tool for operations managers in SMEs. Specifically, the method enables exploiting the ergonomic advantages of available flexible automation technology (e.g. AGVs or picking robots), while assuring that these do not represent a capacity bottleneck. After presenting the method along with the necessary assumptions, mainly concerning the availability of data for the calculations, we report a case study that quantifies the impact of throughput variability on the selection of different process alternatives, where different teams of resources are used.
System- und Schnittstellenbeherrschung, Ideen- und Innovationsmanagement sowie die virtuell integrierte Produkt- und Prozessplanung sind zu entwickelnde Kompetenzen, die der veränderten Rolle des Menschen in der Industrie 4.0 Rechnung tragen. Dezidiert adressiert werden können diese in zukunftsweisend ausgerüsteten Lernfabriken.
The planning and control of intralogistics systems in line with versatile production systems of smart factories requires new approaches and methods to cope with changing requirements within future factories. The planning of intralogistics can no longer follow a static, sequential approach as in the past since the planning assumptions are going to change in a high frequency. Reasons for these constant changes are amongst others external turbulences like rapidly changing market conditions, decreasing batch sizes down to customer-specific products with a batch size of one and on the other hand internal turbulences (like production and logistic resource breakdowns) affecting the production system. This paper gives an insight into research approaches and results how capabilities of intelligent logistical objects (intelligent bins, autonomous transport systems etc.) can be used to achieve a self-organized, cost and performance optimized intralogistics system with autonomously controlled process execution within versatile production environments. A first consistent method has been developed which has been validated and implemented within a scenario at the pilot factory Werk150 at the ESB Business School (Reutlingen University). Based on the incoming production orders, the method of the Extended Profitability Appraisal (EPA) covering the work system value to define the most effective work system for order fulfilment is applied. To derive the appropriate intralogistics processes, an autonomous control method involving principles of decentralized and target-oriented decision-making (e.g. intelligent bins are interacting with autonomously controlled transport systems to fulfil material orders of assembly workstations) has been developed and applied to achieve a target-optimized process execution. The results of the first stage research using predefined material sources and sinks described in this paper is going to set the basis for the further development of a self-organized and autonomously controlled method for intralogistics systems considering dynamic source and sink relations. By allowing dynamic shifts of production orders in the sense of dynamic source and sink relations the cost and performance aims of the intralogistics system can be directly aligned with the aims of the entire versatile production system in the sense of self-organized and autonomously controlled systems.
Shorter product life cycles and emerging technologies are changing the circumstances under which the design of assembly and logistics systems has to be carried out. Engineers are in charge of adapting the production in accordance with the underlying product at a higher pace, oversee a more complex system and find the ideal solution for a functional work system design as well as social interactions between humans and machines in cyber-physical systems. Such collaborative work systems consider the individual capabilities and potentials of humans and machines to combine them in a manner that assists the operator during his daily work routine. To be able to design such work systems, specific competences such as the ability of integrated process and product planning as well as systems and interface competence are required. Learning factories train students as well as professionals to gain such qualifications by providing a close-to-reality learning environment based on a didactical concept which covers all relevant methods for ergonomic work system design and a state-of-the-art infrastructure. Group-based, activity oriented scenarios enable the participants to put the learnings into their everyday work life. Thereby, learning factories have an indirect impact on the transfer of proven best practices to the industry.
Die zunehmende Durchdringung von cyber-physischen Systemen und deren Vernetzung zu cyberphysischen Produktionssystemen (CPPS) führt zu fundamentalen Veränderungen von zukünftigen Montage-, Fertigungs- und Logistiksystemen, welche innovative Methoden zur Planung, Steuerung und Kontrolle von wandlungsfähigen Produktionssystemen erfordern. Zukünftige logistische Systeme werden dabei den Anforderungen einer hochfrequenten Veränderung und Re-Konfiguration ausgelöst durch wandlungsfähige Produktionssysteme für individualisierte Produkte und kleinen Losgrößen unterliegen. Der Einsatz dezentraler Steuerungssysteme, bei denen die komplexen Planungs-, Steuerungs- und Kontrollprozesse auf zahlreiche Knoten und Entitäten des entstehenden Steuerungssystems verteilt werden, bietet ein großes Potential, den Anforderungen in cyber-physischen Logistiksystemen gerecht zu werden. Eine zentrale Herausforderung ist dabei die echtzeitfähige Steuerung und Re-Konfiguration von sogenannten hybriden Logistiksystemen, welche u.a. durch die Kollaboration von Mensch und Maschine, der Kombination verschiedenartiger Fördermittel sowie verschiedenartiger Steuerungsarchitekturen geprägt sind und darüber hinaus auf hybriden Entscheidungsfindungsprozessen beruhen, welche die Fähigkeiten von Menschen und (cyber-physischen) Systemen synergetisch nutzen.
Lernfabriken, wie die ESB Logistik-Lernfabrik an der ESB Business School (Hochschule Reutlingen), bieten dabei weitreichende Möglichkeiten, diese innovativen Methoden, Systeme und technischen Lösungen in einer industrienahen und risikofreien Fabrikumgebung zu entwickeln sowie in die Ausbildung von Studierenden und Weiterbildung von Teilnehmern aus der Industrie zu transferieren. Um die Forschung, Lehre sowie Aus- und Weiterbildung im Bereich zukünftiger Montage-, Fertigungs- und Logistiksysteme auszuweiten, wird das bestehende Produktionssystem der ESB Logistik-Lernfabrik im Rahmen verschiedenster Forschungs- und Studentenprojekte schrittweise in ein dezentral gesteuertes cyber-physisches Produktionssystem, basierend auf einer ereignisorientierten, cloud-basierten und dezentralen Steuerungsarchitektur, überführt.
Today's logistics systems are characterized by uncertainty and constantly changing requirements. Rising demand for customized products, short product life cycles and a large number of variants increases the complexity of these systems enormously. In particular, intralogistics material flow systems must be able to adapt to changing conditions at short notice, with little effort and at low cost. To fulfil these requirements, the material flow system needs to be flexible in three important parameters, namely layout, throughput and product. While the scope of the flexibility parameters is described in literature, the respective effects on an intralogistics material flow system and the influencing factors are mostly unknown. This paper describes how flexibility parameters of an intralogistics system can be determined using a multi-method simulation. The study was conducted in the learning factory “Werk150” on the campus of Reutlingen University with its different means of transport and processes and validated in terms of practical experiments.
The high system flexibility necessary for the full automation of complex and unstructured tasks leads to increased technological complexity, thus to higher costs and lower performance. In this paper, after an introduction to the different dimensions of flexibility, a method for flexible modular configuration and evaluation of systems of systems is introduced. The method starts from process requirements and, considering factors such as feasibility, development costs, market potential and effective impact on the current processes, enables the evaluation of a flexible systems of systems equipped with the needed functionalities before its actual development. This allows setting the focus on those aspects of flexibility that add market value to the system, thus promoting the efficient development of systems addressed to interested customers in intralogistics. An example of application of the method is given and discussed.
Manufacturing companies are confronted with external (e.g. short-term change of product configuration by the customer) and internal (e.g. production process deviations) turbulences which are affecting the performance of production. Predefined, centrally controlled logistics processes are limiting the possibilities of production to initiate countermeasures to react in an optimized way to these turbulences. The autonomous control of intralogistics offers a great potential to cope with these turbulences by using the respective flexibility corridors of production systems and applying intelligent logistic objects with decentralized decision and process execution capabilities to maintain a target-optimized production. A method for AI-based storage-location- and material-handling-optimization to achieve performance-optimized intralogistics system through continuous monitoring of performance-relevant parameters and influencing factors by using AI (e.g. for pattern recognition) has been developed. To provide the basis to investigate and demonstrate the potentials of autonomously controlled intralogistics in connection with turbulences of production and in combination with AI, an intelligent warehouse involving an indoor localization system, smart bins, manual, semi-automated/collaborative and autonomous transport systems has been developed and implemented at Werk150, the factory on campus of ESB Business School (Reutlingen University). This scenario, which has been integrated into graduate training modules, allows the analysis and demonstration of different measures of intralogistics to cope with turbulences in production involving amongst others storage and material provision processes. The target fulfilment of the applied intralogistics measures to master arising turbulences is assessed based on the overall performance of production considering lead times and adherence to delivery dates. By applying artificial intelligence (AI) algorithms the intelligent logistical objects (smart bin, transport systems, etc.) as well as the entire logistics system should be enabled to improve their decision and process execution capabilities to master short-term turbulences in the production system autonomously.
Industrial practice is characterized by random events, also referred to as internal and external turbulences, which disturb the target-oriented planning and execution of production and logistics processes. Methods of probabilistic forecasting, in contrast to single value predictions, allow an estimation of the probability of various future outcomes of a random variable in the form of a probability density function instead of predicting the probability of a specific single outcome. Probabilistic forecasting methods, which are embedded into the analytics process to gain insights for the future based on historical data, therefore offer great potential for incorporating uncertainty into planning and control in industrial environments. In order to familiarize students with these potentials, a training module on the application of probabilistic forecasting methods in production and intralogistics was developed in the learning factory 'Werk150' of the ESB Business School (Reutlingen University). The theoretical introduction to the topic of analytics, probabilistic forecasting methods and the transition to the application domain of intralogistics is done based on examples from other disciplines such as weather forecasting and energy consumption forecasting. In addition, data sets of the learning factory are used to familiarize the students with the steps of the analytics process in a practice-oriented manner. After this, the students are given the task of identifying the influencing factors and required information to capture intralogistics turbulences based on defined turbulence scenarios (e.g. failure of a logistical resource) in the learning factory. Within practical production scenario runs, the students apply probabilistic forecasting using and comparing different probabilistic forecasting methods. The graduate training module allows the students to experience the potentials of using probabilistic forecasting methods to improve production and intralogistics processes in context with turbulences and to build up corresponding professional and methodological competencies.
Especially, if the potential of technical and organizational measures for ergonomic workplace design is limited, exoskeletons can be considered as innovative ergonomic aids to reduce the physical workload of workers. Recent scientific findings from ergonomic analyses with and without exoskeletons are indicating that strain reduction can be achieved, particularly at workplaces with lifting, holding, and carrying processes. Currently, a work system design method is under development incorporating criteria and characteristics for the design of work systems in which a human worker is supported by an exoskeleton. Based on the properties of common passive and active exoskeletons, factors influencing the human on which an exoskeleton can have a positive or negative effect (e.g. additional weight) were derived. The method will be validated by the conceptualization and setup of several work system demonstrators at Werk150, the factory of ESB Business School on campus of Reutlingen University, to prove the positive ergonomic effect on humans and the supporting process to choose the suitable exoskeleton. The developed method and demonstrators enable the user to experience the positive ergonomic effects of exoskeletal support in lifting, holding and carrying processes in logistics and production. The new work system design method will contribute to the fact that employees can pursue their professional activity longer without substantial injuries or can be used more flexibly at different work stations. Also new work concepts, strategies and scenarios are opened up to reduce the risk of occupational accidents and to promote the compatibility of work for employees. A training module is being developed and evaluated with participants from industry and master students to build up competence.