Refine
Document Type
- Conference proceeding (5)
- Journal article (2)
Language
- English (7)
Has full text
- yes (7)
Is part of the Bibliography
- yes (7) (remove)
Institute
- ESB Business School (7) (remove)
Rapidly changing market conditions and global competition are leading to an increasing complexity of logistics systems and require innovative approaches with respect to the organisation and control of these systems. In scientific research, concepts of autonomously controlled logistics systems show a promising approach to meet the increasing requirements for flexible and efficient order processing. In this context, this work aims to introduce a system that is able to adjust order processing dynamically, and optimise intralogistics transportation regarding various generic intralogistics target criteria. The logistics system under consideration consists of various means of transport for autonomous decision-making and fulfilment of transport orders with defined source-sink relationships. The context of this work is set by introducing the Learning Factory Werk 150 with its existing hardware and software infrastructure and its defined target figures to measure the performance of the system. Specifically, the important target figures cost and performance are considered for the transportation system. The core idea of the system’s logic is to solve the problem of order allocation to specific means of transport by linking a Genetic Algorithm with a Multi-Agent System. The implementation of the developed system is described in an application scenario at the learning factory.
The market for indoor positioning systems for a variety of applications has grown strongly in recent years. A wide range of systems is available, varying considerably in terms of accuracy, price and technology used. The suitability of the systems is highly dependent on the intended application. This paper presents a concept to use a single low-cost PTZ camera in combination with fiducial markers for indoor position and orientation determination. The intended use case is to capture a plant layout consisting of position, orientation and unique identity of individual facilities. Important factors to consider for the selection of a camera have been identified and the transformation of the marker pose in camera coordinates into a selectable plant coordinate system is described. The concept is illustrated by an exemplary practical implementation and its results.
Global, competitive markets which are characterised by mass customisation and rapidly changing customer requirements force major changes in production styles and the configuration of manufacturing systems. As a result, factories may need to be regularly adapted and optimised to meet short-term requirements. One way to optimise the production process is the adaptation of the plant layout to the current or expected order situation. To determine whether a layout change is reasonable, a model of the current layout is needed. It is used to perform simulations and in the case of a layout change it serves as a basis for the reconfiguration process. To aid the selection of possible measurement systems, a requirements analysis was done to identify the important parameters for the creation of a digital shadow of a plant layout. Based on these parameters, a method is proposed for defining limit values and specifying exclusion criteria. The paper thus contributes to the development and application of systems that enable an automatic synchronisation of the real layout with the digital layout.
In the past, plant layouts were regarded as highly static structures. With increasing internal and external factors causing turbulence in operations, it has become more necessary for companies to adapt to new conditions in order to maintain optimal performance. One possible way for such an adaptation is the adjustment of the plant layout by rearranging the individual facilities within the plant. Since the information about the plant layout is considered as master data and changes have a considerable impact on interconnected processes in production, it is essential that this data remains accurate and up-to-date. This paper presents a novel approach to create a digital shadow of the plant layout, which allows the actual state of the physical layout to be continuously represented in virtual space. To capture the spatial positions and orientations of the individual facilities, a pan-tilt-zoom camera in combination with fiducial markers is used. With the help of a prototypically implemented system, the real plant layout was captured and converted into different data formats for further use in exemplary external software systems. This enabled the automatic updating of the plant layout for simulation, analysis and routing tasks in a case study and showed the benefits of using the proposed system for layout capturing in terms of accuracy and effort reduction.
The world is becoming increasingly digital. People have become used to learning and interacting with the world around them through technology, accelerated even further by the Covid-19 pandemic. This is especially relevant to the generation currently entering education systems and the workforce. Considering digital aids and methods of learning are important for future learning. The increasing online learning needs open the case for integrating digital learning aspects such as serious gaming within education and training systems. Learning factories fall amongst the education and training systems that can benefit from integration with digital learning extensions. Digital capabilities such as digital twins and models further enable the exploration of integrating digital serious games as an extension of learning factories. Since learning factories are meant for a range of different learning, training, and research purposes, such serious games need to be adaptable across stakeholder perspectives to maximize the value gained from the time and cost invested into such design and development. Research into the development of adaptive serious games for multiple stakeholder perspectives must first determine whether such development can be developed that reaches the objectives set for different included stakeholder perspectives. The purpose of this research is to investigate this at the hand of the practical development of a digital adaptive serious game for stakeholder perspectives.
Today's logistics systems are characterized by uncertainty and constantly changing requirements. Rising demand for customized products, short product life cycles and a large number of variants increases the complexity of these systems enormously. In particular, intralogistics material flow systems must be able to adapt to changing conditions at short notice, with little effort and at low cost. To fulfil these requirements, the material flow system needs to be flexible in three important parameters, namely layout, throughput and product. While the scope of the flexibility parameters is described in literature, the respective effects on an intralogistics material flow system and the influencing factors are mostly unknown. This paper describes how flexibility parameters of an intralogistics system can be determined using a multi-method simulation. The study was conducted in the learning factory “Werk150” on the campus of Reutlingen University with its different means of transport and processes and validated in terms of practical experiments.
Product engineering and subsequent phases of product lifecycles are predominantly managed in isolation. Companies therefore do not fully exploit potentials through using data from smart factories and product usage. The novel intelligent and integrated Product Lifecycle Management (i²PLM) describes an approach that uses these data for product engineering. This paper describes the i²PLM, shows the cause-and-effect relationships in this context and presents in detail the validation of the approach. The i²PLM is applied and validated on a smart product in an industrial research environment. Here, the subsequent generation of a smart lunchbox is developed based on production and sensor data. The results of the validation give indications for further improvements of the i²PLM. This paper describes how to integrate the i²PLM into a learning factory.